Bicycle infrastructure projects.

Projects dated from 2021 through 2026 are grouped as recent. Projects from 2020 or earlier are grouped as past, avoiding uncertain judgments about whether construction or closeout is still active.

Recent Projects (2021–2026)#

Tom Bolack Urban Forest Trail Improvements#

  • City Project Page

    Documents the completed trail paving and solar-lighting project south of I-40 between Louisiana and San Pedro, including PNM utility coordination, the concrete connection near the dog park, construction sequencing, and before-and-after photographs.

Dr. Martin Luther King Jr. Avenue Separated Bicycle Lane Pilot#

  • City Project Page

    Tracks the separated-lane pilot on Dr. Martin Luther King Jr. Avenue, including project limits, safety purpose, installation approach, evaluation period, frequently asked questions, and relationship to the adopted Bikeway and Trail Facilities Plan.

  • Pilot Project FAQ (2026 Archived PDF)

    Explains the pilot limits, safety purpose, separation materials, intersection treatments, maintenance evaluation, ridership data collection, community feedback, and relationship to the adopted Albuquerque bicycle priorities.

    Official City PDF

  • Pilot Project FAQ in Spanish (2026 Archived PDF)

    Provides the City’s Spanish-language explanation of the pilot limits, safety basis, separation materials, intersection treatments, maintenance evaluation, ridership data, community feedback, and relationship to Vision Zero and adopted bicycle priorities.

    Official City PDF

Questions or comments about this pilot: Valerie Hermanson at DMD, [email protected]

Buena Vista Bike Boulevard#

Location: Buena Vista Dr SE, from Central Ave SE to Gibson Blvd SE

Questions or comments email Paul Olson at DMD [email protected]

Moon Street Cycletrack / Bike Boulevard#

Location: Moon Street NE, between Academy Rd NE and Spain Rd NE

  • Moon Street NE Cycletrack Plans

    Documents the planned Moon Street restriping and cycletrack layout between Academy and Spain, including bicycle facilities, lane configuration, markings, and intersection treatments.

Questions or comments email Melissa Roseman at DMD [email protected]

Alameda Drain Trail Phase 6#

Alameda Drain Trail Phase 4#

  • Alameda Drain Trail Phase 4 - County Project Page

    This County trail phase runs from El Pueblo Road to Alameda Boulevard, continuing the shared-use route with landscaping and water-quality features at drain outfalls. The project page reports completion in October 2025.

Past Projects (2020 and Earlier)#

Alameda Drain Trail Earlier Phases#

  • Alameda Drain Trail Phase 1 - County Project Page

    The first County phase runs beside the Alameda Drain between Montano and Osuna Roads, adding shared-use trail space, landscaping, amenities, and water-quality work at stormwater outfalls. The source reports the 2018-2019 construction period.

  • Alameda Drain Trail Phase 2 - County Project Page

    The County phase extends the shared-use trail along the Alameda Drain from Osuna Road to El Pueblo Road, with landscaping, trail amenities, and stormwater-quality features. It is part of the nine-mile master-plan corridor.

Second Street Trail#

  • Second Street Trail Phase 1 - County Project Page

    The first County trail phase built an approximately one-mile, 10-foot-wide asphalt route along the east side of Second Street from the South Diversion Channel to Prosperity Avenue. The page records completion in 2016.

  • Second Street Trail Phase 2 - County Project Page

    The County page documents the approximately one-mile, 10-foot-wide asphalt trail along the east side of Second Street from Prosperity Avenue to Rio Bravo Boulevard, following the earlier South Diversion Channel segment.

Other County Bicycle Projects#

  • Eubank Trail - County Project Page

    The County project built a paved trail, drainage improvements, and bicycle-lane striping along Eubank Boulevard from Wilshire to Alameda; its source records 2017 construction and completion.

  • Rio Grande Boulevard Bike Lane Improvements - County Project Page

    The County project describes widening Rio Grande Boulevard from the Los Ranchos boundary to Alameda Trail for on-street bicycle lanes, with possible sidewalk work, pavement rehabilitation, utility relocation, and irrigation-canal improvements. The page dates construction to 2017.

Paradise Hills Trail#

Silver Avenue Bike Boulevard Review#

I-25 Bicycle Accessibility Study#

Uptown Pedestrian, Bicycle, and Wayfinding Program#

San Pedro Drive and Mile-Hi#

Mountain Road Bike Boulevard at San Pedro Drive#

MLK Avenue and Broadway Boulevard Two-Stage Bike Box#